Monday 23 February 2009

Job done

Well, the first bit anyway...


The 50mm screed on t'cider shed floor is now completed, and curing and drying nicely. The above pic was taken before the final section was laid. The main concrete base was given a good coat of liquid DPM and blinded with sand, before laying and trimming a sheet of 1000 gauge polyethylene DPM to float on top. The sharp sand / cement screed has been laid on top of this. Next job is to lay a very thin liquid screed over this to get a perfectly smooth and flat floor which we can give umpteen coats of concrete paint to. It'll be better than the house! Be able to eat my dinner off it? Doubtful, but at least it should be spot-on for ease of cleaning and keeping clean. The other main requirement is to provide a nice flat surface for the framework and racking to support the two levels of 60 litre containers which are ready to move back into their improved home ASAP.

However, before that we need to sort out the insulation for the walls and roof, and some form of washable sheeting to provide the inner wall surface. Got to keep the E.H. folks happy...

No comments: